PROJECTS
Ongoing & Completed Projects
Marine Projects
 
MARINE PROJECTS
1 
Sr.# PROJECT DESC VALUES CLIENT NAME CLIENT / CONTARCTOR NAME
1 Frontal frame rehabilitation work MMG/Petro Rabigh Frontal frame rehabilitation work fixed using floating crane Frontal frame rehabilitation work fixed using floating crane
2 Cargo handling in Dammam Port 2,000,000.00 lssam Kabbani / Aramco Dammam Cargo handling works in Dammam Port with GSC
3 Steel structure repair work Saudik Cont. Co. ltd. Dammam At berth. No.44, PCQ of King fahad Ind. Marring dolphin Catwalk platform and Handrail replacement wo At berth. No.44, PCQ of King fahad Ind. Marring dolphin Catwalk platform and Handrail replacement wo
4 `M` Arch type rubber Fender replacement work 79,000.00 Speetech/Government. Qurryath At berth No.25, BSQ of KFIP, five (5) nos of SM series Fender fixing work. Fenders Supplied by the c
5 `M` Arch type rubber Fender replacement work Eastern Trading Co. AI Khobar Three (3) `M` Arch type rubber fender replaced Three (3) `M` Arch type rubber fender replaced
6 On Board barge services 50,000.00 Energy & Power Cont. Co.ltd. Al Khobar Lashing and unlashing work
7 Ramp Pulley Block Electronic Electrical Industrial Co. Metal Block assembly for barge lifting & lowering. (for the fixed Ramp) Metal Block assembly for barge lifting & lowering. (for the fixed Ramp)
8 Cargo discharger projects 25,000.00 Abha Corporation Al Khobar Cutting, welding, lashing & unlashing work
 
 
  FOLLOW US ON
  OUR AFFILIATES  
Copyright © 2018 Speetech  All rights reserved. Designed By: SAUDI SOFTECH (MST)