Ongoing & Completed Projects
Marine Projects
 
ONGOING & COMPLETED PROJECTS
1  2  3  Next
Sr.# PROJECT DESC VALUES CLIENT NAME CLIENT / CONTARCTOR NAME
1 System Integration of Seawater Cooling System AI-Harbi I Royal Comision System Integration,Testing and Commissioning System Integration,Testing and Commissioning
2 Analyzer Shelter 120,000.00 TASNEE Supply & Installation
3 Sample Handling System Dar/Petrokemya Supply & Installation Supply & Installation
4 Installation of GC, VCM Plant 140,000.00 ABB/Petrokemya DEP & Installation
5 Installation of TOC Anal zer DAR/Tasnee Installation of Bio Tector TOC Analyzer Installation of Bio Tector TOC Analyzer
6 Siren System @ LOPE/HOPE Plant 690,000.00 TASNEE Supply & Installation
7 Continuous Emission Monitoring System @ Qassim Power Plant KANOO/SEC Testing & Commissioning Testing & Commissioning
8 Continuous Emission Monitoring System @ Rabigh Power Plant 90,000.00 KANOO/SEC Testing & Commissioning
9 Continuous Emission Monitoring System @ PP 10, Riyadh, SEC KANOO/SEC Testing & Commissioning Testing & Commissioning
10 Continuous Emission Monitoring System @ Madina Power Plant 225,000.00 KANOO/SEC Testing & Commissioning
11 Permapure Dryer SABIC YANPET Supply Supply
12 Sampling System 18,750.00 ARAMCO Supply
13 Permapure Dryer System SABIC Supply Supply
14 Design Engineering Package for Analyzers 20,000.00 Yokogawa DEP
15 Design Engineering Package for Flow meter JAL/Petrokemya DEP DEP
 
 